Draft Details

Solar thermal electric plants - Part 3-7: Requirements and test methods for flexible pipe connectors in parabolic trough collector technology
Number:IEC 62862-3-7 ED1
Committee:TC 117
Review end date:03 Apr 2026
 
This draft is no longer available to be viewed. The comments that have been made on it have been collected, and will be considered by the committee responsible for the draft.